10% OFF

Waaree Solar Package – 3kV Setup

Experience the future of renewable energy with the WAAREE Radiance 3 kW On-Grid Single Phase Bifacial Topcon DCR Solar System. This premium solar solution represents a perfect blend of cutting-edge technology, exceptional efficiency, and robust Indian engineering, designed specifically to meet the diverse energy needs of Indian households and small businesses.

Original price was: 149,999.00$.Current price is: 134,999.00$.

Add to wishlist
Compare
SKU: 00020-1-1 Category: Tags: , , Brand:

Transform Your Home Into a Sustainable Energy Powerhouse

Product Overview

Experience the future of renewable energy with the WAAREE Radiance 3 kW On-Grid Single Phase Bifacial Topcon DCR Solar System. This premium solar solution represents a perfect blend of cutting-edge technology, exceptional efficiency, and robust Indian engineering, designed specifically to meet the diverse energy needs of Indian households and small businesses.

Advanced Bifacial Topcon Technology

At the heart of this system lies WAAREE’s revolutionary Bifacial Topcon technology, featuring six high-performance BiN-08 solar panels (560W-570W each). Unlike traditional solar panels that only capture sunlight from the front, these bifacial modules harness solar energy from both sides, delivering up to 30% higher energy yield. The advanced Topcon (Tunnel Oxide Passivated Contact) technology ensures superior electron flow and dramatically reduced power losses, making this system one of the most efficient solar solutions available in the Indian market today.

Complete Turnkey Solar Solution

This comprehensive solar kit includes everything needed for a professional-grade installation. The system features a state-of-the-art WS On Grid 1 Phase Inverter (3 KVA-Gen4) that seamlessly converts DC power from your solar panels into usable AC power for your home. The inverter’s advanced MPPT (Maximum Power Point Tracking) technology continuously optimizes power output, ensuring you capture every ray of available sunlight throughout the day.

Premium Safety & Protection Features

Safety is paramount in the WAAREE Radiance system design. The kit includes IP65-rated DCDB and ACDB distribution boxes that provide superior protection against environmental factors including dust, moisture, and extreme weather conditions. The comprehensive earthing system includes three copper-bonded earthing rods, professional-grade earthing chemicals, and FRP earth pit chambers, ensuring complete electrical safety for your family and property.

The integrated lightning arrestor system provides additional protection against electrical surges and lightning strikes, while high-quality Surge Protection Devices (SPD) from trusted brands like Finder and Schneider safeguard your investment against voltage fluctuations and grid instabilities.

Government DCR Compliance & Subsidy Benefits

This system is fully compliant with India’s Domestic Content Requirement (DCR) regulations, making you eligible for substantial government subsidies and incentives. The DCR compliance ensures that you’re not only investing in clean energy but also supporting India’s domestic solar manufacturing ecosystem while potentially saving up to 40% on your initial investment through various central and state government schemes.

Superior Build Quality & Durability

Every component in the WAAREE Radiance system is engineered for the Indian climate. The UV-protected cable management system uses premium XLPO DC cables with superior heat resistance and longevity. High-grade MC-4 connectors ensure weatherproof electrical connections, while stainless steel 316 cable dressing clips resist corrosion even in coastal environments.

The solar panels feature advanced anti-reflective coating and tempered glass construction that withstands hail impact up to 25mm diameter, making them perfect for India’s diverse weather conditions from the scorching heat of Rajasthan to the heavy monsoons of Kerala.

Financial Benefits & Energy Independence

With this 3 kW system, you can expect to generate approximately 12-15 units of electricity daily (depending on your location’s solar irradiance), translating to significant monthly savings on your electricity bills. The system typically pays for itself within 4-6 years through electricity bill savings, after which you enjoy virtually free electricity for the remaining 20+ year lifespan of the panels.

The net metering capability allows you to sell excess electricity back to the grid, turning your rooftop into a profitable energy asset. During peak generation hours, surplus power is fed into the grid, earning you credits that offset your nighttime electricity consumption.

Environmental Impact

By choosing the WAAREE Radiance 3 kW system, you’re making a substantial contribution to environmental conservation. This system prevents approximately 3-4 tons of CO2 emissions annually, equivalent to planting 40-50 trees every year. Over its 25-year warranty period, your solar system will offset more than 75 tons of carbon emissions, making a meaningful impact on climate change mitigation.

Professional Installation & Support

The system comes with comprehensive installation support, including detailed technical documentation, pre-configured electrical components, and access to WAAREE’s nationwide network of certified installers. The modular design ensures faster installation times, typically completed within 1-2 days for residential applications.

Industry-Leading Warranty

WAAREE backs this system with an industry-leading warranty package:

  • 25-year linear power output warranty on solar panels
  • 5-year comprehensive warranty on the inverter
  • 2-year warranty on balance of system components
  • Nationwide service support through authorized service centers

Technical Specifications Summary

  • System Capacity: 3 kW (3000 Watts)
  • Panel Technology: Bifacial Topcon DCR
  • Number of Panels: 6 panels (560W-570W each)
  • Inverter Type: Single Phase On-Grid (3 KVA)
  • Daily Generation: 12-15 kWh (location dependent)
  • Monthly Savings: ₹1,000-1,500 (approximate)
  • System Lifespan: 25+ years
  • Payback Period: 4-6 years

Why Choose WAAREE Radiance?

WAAREE Energies, India’s largest solar panel manufacturer with over three decades of experience, brings you this premium solar solution that combines reliability, efficiency, and value. The Radiance series represents the pinnacle of Indian solar technology, designed and manufactured in India for Indian conditions.

With over 9 GW of solar installations worldwide and a reputation built on quality and innovation, WAAREE stands behind every system with comprehensive support and service. When you choose WAAREE Radiance, you’re not just buying a solar system – you’re investing in India’s energy independence and your family’s sustainable future.

Efficiency

23%

Solar Cell Type

Mono PERC

Solar Panel Type

Bifacial – 500W

Product Warranty

5 Years

Performance Warranty

30 Years

All Weather Proof

Yes.

Certifications

10 Certifications

Deployment Type

On-Grid or Grid Tied System

Cells per Module

144 Cells

Water Proofing

IP68 Rated / MC4 Compatible

Operating Temprature

-40°C to 85°C

Solar Panel Installation Process for 3KW Adani Power in India

Installing a 3KW Adani Power Solaroof system typically involves a grid-tied setup on rooftops, requiring about 300 sq ft of shade-free space. The process, handled by authorized TATA installers, takes 3-4 weeks and includes net metering for grid export. Follow these steps:

  1. Site Survey and Assessment: Contact a TATA Power dealer. An engineer visits to evaluate roof size, orientation (south-facing ideal), shading, and energy needs. Confirm feasibility and design.

  2. Foundation Preparation: Dig holes and pour concrete for mounting structure columns (e.g., 4 columns). Allow 1 week for curing with regular watering to ensure stability.

  3. Mounting Structure Installation: Assemble and fit the metal frame (angles) on the cured foundation. Ensure optimal tilt angle for maximum sunlight capture, as per location specs.

  4. Solar Panel Mounting: Secure TATA solar modules (typically 8-10 panels for 3KW) onto the structure. Handle carefully, avoiding shadows or loads on panels. Interconnect modules per diagram.

  5. Inverter and Electrical Setup: Install the grid-tie inverter (e.g., 3KW capacity). Connect DC cables from panels to inverter via array junction box. Add AC distribution board for output to load/grid.

  6. Wiring and Earthing: Route wires through conduits. Install three separate earthings: one for panels, one for inverter, and one for electrical connection using copper rods buried 3-4 feet deep.

  7. Net Metering and Approvals: Apply for net meter installation through local utility (e.g., DISCOM). Obtain necessary permissions for grid connection.

  8. Testing and Commissioning: Test connections, ensure safety (use PPE, cover panels during wiring). Activate system; monitor via app for performance.

Ensuring PM Surya Ghar Yojana Subsidy for Your Solar Installation

As your solar marketplace partner, we’ll guide you through the PM Surya Ghar: Muft Bijli Yojana subsidy process for residential rooftop solar systems. This central scheme offers up to Rs 78,000 for a 3kW system, covering 60% of costs up to 2kW and 40% beyond, capped at 3kW. We’ll coordinate all steps, including DISCOM interactions, to ensure eligibility and timely subsidy disbursement. Eligibility requires Indian citizenship, home ownership with a suitable roof, a valid electricity connection, and no prior solar subsidies.

Required Documents

You’ll need to provide these for registration and verification (we’ll assist in preparation):

  • Aadhaar card

  • Income certificate

  • Domicile certificate

  • Recent electricity bill

  • Bank passbook or account details

  • Cancelled cheque

  • Passport-size photo

  • Ration card

Step-by-Step Process

We’ll handle coordination, documentation, and follow-ups with your DISCOM (e.g., for feasibility and net metering). The entire process typically takes 2-3 months, from application to subsidy receipt, depending on DISCOM efficiency.

  1. Registration on National Portal: We’ll help you register at pmsuryaghar.gov.in with your state, DISCOM, consumer number, mobile, and email. This initiates the application and informs you of subsidy amounts. Timeline: Immediate.

  2. Submit Application and Get Feasibility Approval: Upload documents and apply for rooftop solar. We’ll forward it to DISCOM for technical feasibility check. DISCOM approves within 15 days. We’ll monitor and resolve any issues.

  3. Select Vendor and Install System: Choose a registered vendor (we’ll recommend from our network). Install the system post-approval. We’ll oversee to ensure compliance. Timeline: 30-45 days after approval.

  4. Apply for Net Metering: Post-installation, we’ll submit plant details online and apply for net meter. DISCOM installs and inspects. Timeline: 7-15 days.

  5. Obtain Commissioning Certificate: After inspection, DISCOM generates the certificate online. We’ll confirm receipt.

  6. Submit Bank Details for Subsidy: Upload bank details and cancelled cheque on the portal. We’ll verify submission. Timeline: Within 7 days of commissioning.

  7. Subsidy Disbursement: Subsidy is credited directly to your bank account within 30 days of submission. We’ll track and follow up if delayed.

If any step faces delays, we’ll liaise with DISCOM for resolution. Contact us for personalized support to maximize your free electricity benefits up to 300 units monthly.

Adani Power Grid-Tie Solar System — Data Sheet Overview

Click to view Grid-tied Datasheet Document 

System Type: Grid-Tied Rooftop Solar Setup
Capacity Example: 3 kW (3,000 Wp)
Power Output Range: 1 kW to 10 kW (system scalable)
Components:

  • Solar Panels/Modules: High-efficiency, long-lasting Tata Power solar modules

  • Inverter: MPPT-based (1 kVA–10 kVA range), digital display, remote monitoring option

  • Mounting Structure: Hot-dip galvanized steel, weatherproof for Indian rooftops

  • Metering: Bi-directional/net meter to credit excess power sent to grid

  • Monitoring: 24×7 remote monitoring (optional)

  • Installation: Quick and hassle-free, handled by Tata Power authorized professionals

  • Features:

    • Active fault monitoring for safety

    • Rapid service support

    • Maintenance-free operation

  • Benefits:

    • Reduces electricity bills

    • Utilizes idle rooftop space

    • Sell excess energy back to the grid

    • Protects against rising power costs

    • Supplies clean, green energy

Warranty for Adani Power Solar System

Click here to view warranty-certificate

The attached warranty is a Limited Warranty provided by Tata Power Solar for its installed systems:

  • PV Modules: Warranty as per OEM data sheet (typically 25 years performance warranty)

  • Pump with Controller: 5 years

  • Structures & Cables: 5 years

  • Inverter & Other Parts: 5 years

  • Installation Warranty:

    • Covers installation as per Indian standards

    • Must report any installation issues within 2 working days

  • Exclusions:

    • Misuse, unauthorized repairs, and incorrect installation void warranty

    • Warranty applies only to the first owner and original site

    • See detailed exclusions in the document for environmental and usage conditions

  • Claims:

    • Warranty claims must include invoice, serial numbers, installation details, and be made in writing within two working days of discovering a defect

Support:
Tata Power offers pan-India service and rapid support through its network and call center.


Refer to the attached warranty certificate for full terms, coverage, and contact details for service claims.

Reviews

There are no reviews yet.

Be the first to review “Waaree Solar Package – 3kV Setup”

Your email address will not be published. Required fields are marked *

Our offer