26% OFF

Tata Solar Package – 3kV Setup

The Tata Solar 3kV setup is your trusted solution for clean, sustainable, and cost-efficient energy.

Original price was: 165,000.00$.Current price is: 122,000.00$.

Add to wishlist
Compare
SKU: 00020 Category: Tags: , , Brand:

Power Your Home with Tata Solar 3kV Setup

The Tata Solar 3kV setup is your trusted solution for clean, sustainable, and cost-efficient energy. Designed with advanced technology and a commitment to performance, this solar energy system seamlessly integrates into your home or business, ensuring you enjoy uninterrupted power while reducing electricity bills. It’s not just a product; it’s an investment in a greener future.

Why Choose the Tata Solar 3kV Setup?

What sets the Tata Solar 3kV system apart is its reliability and efficiency. With a robust design configured to deliver optimal performance, this system is perfect for both urban and rural environments. The 3kV capacity ensures that you can power an array of appliances, gadgets, and essential systems effortlessly. Utilizing high-quality photovoltaic panels, the setup is engineered to ensure maximum energy conversion with minimal wastage.

Additionally, the Tata Solar 3kV solution is a low-maintenance system equipped with durable components that withstand diverse weather conditions. Whether you experience scorching summers or heavy monsoons, this solar system delivers consistent performance, giving you peace of mind and long-term value.

Key Features of Tata Solar 3kV Setup

1. High Efficiency: Equipped with high-grade photovoltaic technology, this system promises seamless energy production for homes and businesses of all sizes.

2. Durable Build: Manufactured with weather-resistant materials, this setup is built for durability, ensuring it withstands the test of time.

3. Eco-Friendly Performance: By utilizing solar energy, you reduce your carbon footprint and contribute to a cleaner environment—sustainability at its best.

4. Smart Integration: The Tata Solar 3kV setup integrates effortlessly with your existing infrastructure, ensuring convenience and efficiency.

5. Low Maintenance: Thanks to its cutting-edge technology and design, the regular upkeep costs are minimal.

Make the Shift to Renewable Energy Today

With the increasing volatility of energy costs and the growing need for eco-conscious solutions, the Tata Solar 3kV setup is your gateway to energy independence. Whether you’re looking to reduce your expenses, ensure a reliable power supply, or embrace a greener lifestyle, this product delivers on all fronts.

Take the first step towards sustainable living. Upgrade to the Tata Solar 3kV setup today and enjoy the benefits of renewable energy like never before. Make the smart choice for your future, your wallet, and the planet!

Efficiency

23%

Solar Cell Type

Mono PERC

Solar Panel Type

Bifacial – 500W

Product Warranty

5 Years

Performance Warranty

30 Years

All Weather Proof

Yes.

Certifications

10 Certifications

Deployment Type

On-Grid or Grid Tied System

Cells per Module

144 Cells

Water Proofing

IP68 Rated / MC4 Compatible

Operating Temprature

-40°C to 85°C

Solar Panel Installation Process for 3KW TATA Power in India

Installing a 3KW TATA Power Solaroof system typically involves a grid-tied setup on rooftops, requiring about 300 sq ft of shade-free space. The process, handled by authorized TATA installers, takes 3-4 weeks and includes net metering for grid export. Follow these steps:

  1. Site Survey and Assessment: Contact a TATA Power dealer. An engineer visits to evaluate roof size, orientation (south-facing ideal), shading, and energy needs. Confirm feasibility and design.

  2. Foundation Preparation: Dig holes and pour concrete for mounting structure columns (e.g., 4 columns). Allow 1 week for curing with regular watering to ensure stability.

  3. Mounting Structure Installation: Assemble and fit the metal frame (angles) on the cured foundation. Ensure optimal tilt angle for maximum sunlight capture, as per location specs.

  4. Solar Panel Mounting: Secure TATA solar modules (typically 8-10 panels for 3KW) onto the structure. Handle carefully, avoiding shadows or loads on panels. Interconnect modules per diagram.

  5. Inverter and Electrical Setup: Install the grid-tie inverter (e.g., 3KW capacity). Connect DC cables from panels to inverter via array junction box. Add AC distribution board for output to load/grid.

  6. Wiring and Earthing: Route wires through conduits. Install three separate earthings: one for panels, one for inverter, and one for electrical connection using copper rods buried 3-4 feet deep.

  7. Net Metering and Approvals: Apply for net meter installation through local utility (e.g., DISCOM). Obtain necessary permissions for grid connection.

  8. Testing and Commissioning: Test connections, ensure safety (use PPE, cover panels during wiring). Activate system; monitor via app for performance.

Ensuring PM Surya Ghar Yojana Subsidy for Your Solar Installation

As your solar marketplace partner, we’ll guide you through the PM Surya Ghar: Muft Bijli Yojana subsidy process for residential rooftop solar systems. This central scheme offers up to Rs 78,000 for a 3kW system, covering 60% of costs up to 2kW and 40% beyond, capped at 3kW. We’ll coordinate all steps, including DISCOM interactions, to ensure eligibility and timely subsidy disbursement. Eligibility requires Indian citizenship, home ownership with a suitable roof, a valid electricity connection, and no prior solar subsidies.

Required Documents

You’ll need to provide these for registration and verification (we’ll assist in preparation):

  • Aadhaar card

  • Income certificate

  • Domicile certificate

  • Recent electricity bill

  • Bank passbook or account details

  • Cancelled cheque

  • Passport-size photo

  • Ration card

Step-by-Step Process

We’ll handle coordination, documentation, and follow-ups with your DISCOM (e.g., for feasibility and net metering). The entire process typically takes 2-3 months, from application to subsidy receipt, depending on DISCOM efficiency.

  1. Registration on National Portal: We’ll help you register at pmsuryaghar.gov.in with your state, DISCOM, consumer number, mobile, and email. This initiates the application and informs you of subsidy amounts. Timeline: Immediate.

  2. Submit Application and Get Feasibility Approval: Upload documents and apply for rooftop solar. We’ll forward it to DISCOM for technical feasibility check. DISCOM approves within 15 days. We’ll monitor and resolve any issues.

  3. Select Vendor and Install System: Choose a registered vendor (we’ll recommend from our network). Install the system post-approval. We’ll oversee to ensure compliance. Timeline: 30-45 days after approval.

  4. Apply for Net Metering: Post-installation, we’ll submit plant details online and apply for net meter. DISCOM installs and inspects. Timeline: 7-15 days.

  5. Obtain Commissioning Certificate: After inspection, DISCOM generates the certificate online. We’ll confirm receipt.

  6. Submit Bank Details for Subsidy: Upload bank details and cancelled cheque on the portal. We’ll verify submission. Timeline: Within 7 days of commissioning.

  7. Subsidy Disbursement: Subsidy is credited directly to your bank account within 30 days of submission. We’ll track and follow up if delayed.

If any step faces delays, we’ll liaise with DISCOM for resolution. Contact us for personalized support to maximize your free electricity benefits up to 300 units monthly.

TATA Power Grid-Tie Solar System — Data Sheet Overview

Click to view Grid-tied Datasheet Document 

System Type: Grid-Tied Rooftop Solar Setup
Capacity Example: 3 kW (3,000 Wp)
Power Output Range: 1 kW to 10 kW (system scalable)
Components:

  • Solar Panels/Modules: High-efficiency, long-lasting Tata Power solar modules

  • Inverter: MPPT-based (1 kVA–10 kVA range), digital display, remote monitoring option

  • Mounting Structure: Hot-dip galvanized steel, weatherproof for Indian rooftops

  • Metering: Bi-directional/net meter to credit excess power sent to grid

  • Monitoring: 24×7 remote monitoring (optional)

  • Installation: Quick and hassle-free, handled by Tata Power authorized professionals

  • Features:

    • Active fault monitoring for safety

    • Rapid service support

    • Maintenance-free operation

  • Benefits:

    • Reduces electricity bills

    • Utilizes idle rooftop space

    • Sell excess energy back to the grid

    • Protects against rising power costs

    • Supplies clean, green energy

Warranty for TATA Power Solar System

Click here to view warranty-certificate

The attached warranty is a Limited Warranty provided by Tata Power Solar for its installed systems:

  • PV Modules: Warranty as per OEM data sheet (typically 25 years performance warranty)

  • Pump with Controller: 5 years

  • Structures & Cables: 5 years

  • Inverter & Other Parts: 5 years

  • Installation Warranty:

    • Covers installation as per Indian standards

    • Must report any installation issues within 2 working days

  • Exclusions:

    • Misuse, unauthorized repairs, and incorrect installation void warranty

    • Warranty applies only to the first owner and original site

    • See detailed exclusions in the document for environmental and usage conditions

  • Claims:

    • Warranty claims must include invoice, serial numbers, installation details, and be made in writing within two working days of discovering a defect

Support:
Tata Power offers pan-India service and rapid support through its network and call center.


Refer to the attached warranty certificate for full terms, coverage, and contact details for service claims.

Reviews

There are no reviews yet.

Be the first to review “Tata Solar Package – 3kV Setup”

Your email address will not be published. Required fields are marked *

Our offer